What open permits and unpermitted work actually cost you at closing

In Broward County, few things derail a clean closing faster than a permit issue that surfaced two weeks before the settlement date.
Most sellers do not even know they have one. Often it was a water heater replaced ten years ago, an electrical panel upgrade done by a previous owner, or a patio enclosure that never had a final inspection signed off.
It sits quietly in the municipal records until a title company runs a lien and permit search, and suddenly the closing table stops moving.
WHAT HAPPENS WHEN AN OPEN PERMIT SURFACES
Once a buyer’s lender or title company flags an open or expired permit, you rarely have the option to simply ignore it.
Lenders will hold funding until the city clears the record, and cash buyers will use the uncertainty to ask for a substantial credit at the eleventh hour.
Closing out an old permit can require hiring an engineer, opening up finished drywall for an inspector, or paying retroactive fees. Doing that under a contract deadline means paying rush rates to whoever is available that week.
WHY CHECKING EARLY CHANGES THE MATH
When you check your property’s permit history six months or a year before listing, an open permit is just a paperwork errand.
You have time to call the city building department, track down the original contractor, or bring in a licensed tradesperson on a normal schedule without a buyer watching the clock.
Even if a permit cannot be closed easily, knowing about it upfront allows us to disclose it properly and price the house around reality rather than renegotiating under pressure.
THE FOUR ITEMS INSPECTORS AND TITLE COMPANIES CHECK FIRST
The roof, because an unpermitted or expired roof permit affects both insurance eligibility and lender approval in South Florida.
Impact windows and doors, which require a Notice of Acceptance and a final municipal sign-off to count toward wind mitigation credits.
Electrical panels and A/C changeouts, the two most common replacements done without pulling the final inspection.
Additions and garage conversions, where unpermitted square footage cannot be counted the same way in an appraisal.
HOW TO FIND OUT WHERE YOUR HOUSE STANDS
You do not have to guess what is sitting in the city’s file for your address.
Before you ever put a sign in the yard, I can pull the public permit history alongside recent neighborhood comparables so you know if anything needs attention before a buyer ever sees the house.
Ask for a pre-listing check on your address → gabrielleditommaso.com/contact